Details

    • An action attached to a parent task
    • Resolution: Unresolved
    • Blocker

    Description

      Inbound: Compliance Specification (latest version) & Code Screening approval artifact


      Outbound: Integration process start

      This is the starting point for integration. The BIT needs to be assured the specified component is accepted technically (through compliance) and legally (through code screening.)

      If the package is listed in the Compliance specification, the BIT can be assured it is technically accepted by the System Architects. The BIT will need a similar document or artifact from the code screening process to assure of legal and IPR acceptance.

      Attachments

        Activity

          People

            philippe.robin Philippe Robin
            jeremiah.foster Jeremiah Foster (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            0 Start watching this issue

            Dates

              Created:
              Updated: